Studio Access Platform Installation – Dublin
Client: Production Company
Venue: Studio Environment (Ireland)
Services Provided: Access structures, platform installation, scaffold system
Overview
One Event Infrastructure delivered a last-minute access platform installation within a live studio environment in Ireland.
The request was received on a Thursday, with full installation required by Saturday, requiring rapid mobilisation across crew and materials.
Scale at a Glance
Elevated access structure
Integrated access system
Full installation and removal
Temporary hire period
Programme & Delivery
The works were delivered within a 48-hour turnaround window in line with production requirements.
Delivery required:
Rapid mobilisation following short-notice request
Installation within an active studio environment
Coordination with ongoing set construction
Efficient use of space within a constrained layout
What We Delivered
Supply and installation of elevated platform structure
Scaffold access system with integrated staircase
Safe and stable access solution for production use
Full de-rig following hire period
Our Approach
Delivery focused on speed, control, and practical functionality.
Key priorities included:
Rapid deployment of experienced crew
Efficient sequencing of installation works
Safe and stable structural build
Clean integration within existing set environment
Outcome
The structure was delivered safely, on time, and ready for use within the required production schedule.
Key Takeaway
Short-notice delivery depends on having the right people, the right equipment, and the ability to mobilise without delay.