Studio Access Platform Installation – Dublin

Client: Production Company
Venue: Studio Environment (Ireland)
Services Provided: Access structures, platform installation, scaffold system

Overview

One Event Infrastructure delivered a last-minute access platform installation within a live studio environment in Ireland.

The request was received on a Thursday, with full installation required by Saturday, requiring rapid mobilisation across crew and materials.

Scale at a Glance

  • Elevated access structure

  • Integrated access system

  • Full installation and removal

  • Temporary hire period

Programme & Delivery

The works were delivered within a 48-hour turnaround window in line with production requirements.

Delivery required:

  • Rapid mobilisation following short-notice request

  • Installation within an active studio environment

  • Coordination with ongoing set construction

  • Efficient use of space within a constrained layout

What We Delivered

  • Supply and installation of elevated platform structure

  • Scaffold access system with integrated staircase

  • Safe and stable access solution for production use

  • Full de-rig following hire period

Our Approach

Delivery focused on speed, control, and practical functionality.

Key priorities included:

  • Rapid deployment of experienced crew

  • Efficient sequencing of installation works

  • Safe and stable structural build

  • Clean integration within existing set environment

Outcome

The structure was delivered safely, on time, and ready for use within the required production schedule.

Key Takeaway

Short-notice delivery depends on having the right people, the right equipment, and the ability to mobilise without delay.

Previous
Previous

Historic Stage Structural Propping – Corporate Installation Case Study