Historic Stage Structural Propping – Corporate Installation Feb 2026

Client: Private Corporate Client
Venue: Historic Venue (Ireland)
Event Type: Corporate
Timing: February 2026
Services Provided: Temporary structural propping, installation support & de-rig

Overview

One Event Infrastructure delivered temporary structural under-propping beneath a historic stage to safely accommodate a heavy corporate installation.

The works were completed in collaboration with an appointed structural engineer to ensure the imposed load was appropriately redistributed without impacting the existing structure.

Much of the work took place out of sight, beneath the stage, where careful access, load management, and protection of original materials were critical.

Scale at a Glance

Temporary under-propping of existing historic stage

  • Installation designed in collaboration with structural engineer

  • Load management for heavy corporate installation

  • Full removal and reinstatement following event

All works were temporary and reversible.

Programme & Delivery

The under-stage environment required controlled access and careful sequencing.

Delivery included:

  • Coordination with structural engineer to confirm support locations

  • Installation of adjustable steel props with timber spread plates

  • Protection of existing stage construction

  • Working around existing services and restricted access routes

  • Removal in reverse sequence following event

What We Delivered

  • Temporary structural support system

  • Load spread using timber packers and plates

  • Installation within confined working conditions

  • Controlled access and safe working procedures

  • Full de-rig and reinstatement

Our Approach

Delivery focused on restraint and structural understanding.

Key priorities included:

  • Protecting original timber members

  • Avoiding direct point loading

  • Maintaining clear communication with engineer

  • Working safely within low-clearance void

  • Leaving no trace once removed

Outcome

The corporate installation was successfully supported without impact to the historic stage.

The project was completed with:

  • Structural integrity maintained

  • No damage to original fabric

  • Clean reinstatement post-event

Key Takeaway

Not all infrastructure is visible.

This project demonstrates One Event Infrastructure’s ability to deliver engineered temporary works beneath historic structures, safely, respectfully, and without disruption.