Private Corporate Event – Arena Rigging Installation Feb 2026

Client: Private Corporate Client
Venue: 3Arena
Event Type: Corporate / Live Production
Timing: February 2026
Services Provided: Rigging supervision, labour supply, spreader truss provision & certification

Overview

One Event Infrastructure delivered large-scale production rigging services for a private corporate event within the 3Arena, Dublin.

The project involved the installation of over 140 rigging points across the arena roof structure, including areas not previously rigged for live production.

Works required close coordination with venue technical teams and the integration of IRATA-certified rescue support due to off-grid climbing and beam access.

Scale at a Glance

Within the 3Arena roof structure, One Event Infrastructure delivered:

  • 140+ rigging points installed

  • Installation across closed grid and off-grid beam locations

  • Spreader truss provision where required

  • IRATA-certified rescue team integrated into works

Crew deployment reflected the scale and complexity of the installation:

  • 15 riggers deployed during primary day builds

  • 9–15 riggers deployed across night and follow-on shifts

  • Multi-day installation and load-out phases supported by large arena-experienced crews

All rigging was installed, inspected, and formally handed over in accordance with approved RAMS and industry best practice.

Programme & Delivery

The works were delivered across load-in, show period and load-out phases in line with the agreed production schedule.

Delivery required:

  • Advance coordination with 3Arena technical management

  • Installation in roof areas not previously utilised for production rigging

  • Off-grid climbing and beam access

  • Implementation of exclusion zones and controlled work areas

  • Daily Dynamic Risk Assessments prior to each shift

IRATA-certified rescue riggers were present for all high-risk access works.

What We Delivered

  • Rigging supervision under an appointed Head Rigger

  • Installation of rigging points using dead hangs, bridles and spreader truss

  • Coordination with touring production and venue teams

  • Visual inspection and structured handover

  • Formal rigging completion certification

Our Approach

Delivery focused on competence, control and collaboration.

Key priorities included:

  • Deploying experienced arena riggers familiar with 3Arena roof systems

  • Coordinating access methods between closed grid, MEWP and off-grid climbing

  • Maintaining strict supervision and communication

  • Ensuring all works were delivered under an approved RAMS framework

  • Integrating third-party IRATA rescue provision where required

Outcome

The installation was completed safely, to programme, and in accordance with venue requirements.

The project was completed with:

  • Over 140 rigging points installed

  • Full compliance with approved RAMS

  • IRATA rescue provision integrated throughout

  • Formal completion certification issued

Key Takeaway

Complex arena rigging requires experience, planning, and coordination across production, venue, and specialist access teams.

This project demonstrates One Event Infrastructure’s capability to deliver high-volume rigging installations in technically demanding arena environments.