Forbidden Fruit 2026 – Event Infrastructure Delivery
Client: POD
Venue: Royal Hospital Kilmainham
Event Type: Festival & Live Concert Infrastructure
Timing: May/June 2026
Services Provided: Stage structures, audience infrastructure, crowd control systems, temporary access, production support structures, ground protection
Overview
One Event Infrastructure delivered a comprehensive package of temporary event infrastructure for Forbidden Fruit 2026, followed by the Addison Rae concert at Royal Hospital Kilmainham.
The project involved the installation of multiple performance areas, audience infrastructure and production support systems before transitioning the site between two different event formats within a compressed programme.
Scale at a Glance
Multiple performance stages across the site
Front-of-stage barrier systems
Accessible viewing platforms
Front of House platforms
PA support towers and screen structures
Temporary access routes and ditch crossings
Ground protection systems
Production support infrastructure
Programme & Delivery
The initial festival build was completed within a one-week programme, followed by a two-day transition to reconfigure the site for the subsequent headline concert.
Working within the historic grounds of Royal Hospital Kilmainham required careful planning, coordinated sequencing and close collaboration with production teams and other contractors to maintain programme throughout.
What We Delivered
Supply and installation of multiple stage structures
Front-of-stage barrier systems
Accessible viewing platforms and ramps
Front of House platforms
PA support towers and screen support structures
Temporary bridges and access infrastructure
Ground protection across operational areas
Scaffold structures for signage, flags and site dressing
Coordination with production and venue stakeholders
Structured inspection and handover of all installed infrastructure
Our Approach
Delivery focused on efficient programme management and maximising the value of installed infrastructure.
Sequenced installation across multiple work fronts
Planned transition between festival and concert configurations
Coordinated closely with production teams throughout
Adapted existing infrastructure to minimise unnecessary rebuilding
Delivered practical infrastructure solutions that supported both events
Outcome
The project was successfully delivered within programme, supporting both Forbidden Fruit and the subsequent Addison Rae concert from a single coordinated infrastructure package.
The completed works provided:
Safe audience movement throughout the site
Accessible viewing facilities
Production-ready performance spaces
Efficient operational access
Controlled front-of-stage environments
A seamless transition between two live event formats
Key Takeaway
Good event infrastructure doesn't stop when the first event finishes.
It creates the foundation for everything that follows.